Bcn3611 term project | BCN 3611 | Florida International University, Modesto A. Maidique Campus - Miami, FL

BCN3611 Term Project lalaloopsUnsure of how to approach this and analyze plans.

  • 2 years ago
  • 35

DEPT. OF CONSTRUCTION MANAGEMENT BCN 3611 - CONST. COST ESTIMATING I

FALL 2019

TERM PROJECT ASSIGNMENT DESCRIPTION One-Story Single Family House (MAKU Residence)

OBJECTIVE AND GENERAL REQUIREMENTS

The objective of the term project assignment is to prepare a Bid Proposal for constructing a one-story single family house (MAKU Residence). Students must approach the assignment from the perspective of a construction contractor attending a bid, and prepare a professional price proposal using their knowledge, skills and common sense. This requires proper efforts with regards to:

  • Reading and understanding plans; • Recognizing construction work items; • Surveying the quantity for various types of work; • Using cost databases to acquire cost of construction efforts; • Estimating indirect and total cost of construction; and • Submitting and presenting a professional proposal of their cost estimation.

General requirements of the proposal are as following:

  • This is an individual assignment and students will not be allowed to work in groups. • Use the project plans and other reference material posted on Canvas to identify the scope of work

in this project and complete the quantity take-off. • Follow the CSI MasterFormat® (2004 Edition) in organizing the cost estimate proposal. • Use the R.S. Means Online website (https://www.rsmeansonline.com) to get cost data for all identified work items. It is the students’ responsibility to follow up on the invitation email to setup an account on the R.S. Means Online website and to inform the instructor immediately if they have not received such email (double check your email spam folder).

  • In case of any missing or incomplete information, students can make reasonable and justifiable assumptions. All assumptions must be clearly listed in the proper sections of the proposal, as described later in this document.

MINIMUM SCOPE

This section describes the minimum scope of work required in this project. This includes items from the following 11 CSI MasterFormat® divisions: Division 01: General Conditions and Requirements • Identify all general requirement items that should apply to this job, assuming 12 month duration for entire construction. Students are encouraged to make reasonable and justifiable assumptions based on common sense and regular construction practices to cover any missing information. Division 03: Concrete (for Slab, Footings, and Foundations) • Concrete forming and reinforcing steel, including required accessories (use separate cost items) • Concrete placement (including curing and finishing, wherever applicable) Division 04: Masonry • Masonry units and accessories (including mortar and grout, if needed) • Bond Beams Engineering & Computing

FLORIDA INTERNATIONAL UNIVERSITY

Term Project Assignment 09/11/2019 Page 1| 3 Engineering DEPT- OF c o n s t r u c t i o n m a n a g e m e n t & Computing BCN 3611 - c o n s t , c o s t e s t i m a t i n g i

FALL 2019FLORIDA INTERNATIONAL UNIVERSITY

Division 05: Metals • Wall studs Division 06: Wood • Roof framing structure (prefabricated truss system) and sheathing • Others Division 07: Thermal and Moisture Protection • Below-grade moisture protection (primer, vapor barrier, protection board, coving material, etc.) • Walls (interior and exterior) and ceiling thermal insulation. Use R-l 1 insulation for interior walls. • Roof Tiles and accessories Division 08: Openings • Doors and Windows Division 09: Finishes • All wall, flooring and ceiling finishes Division 11: Equipment • Residential appliances such as kitchen equipment, washers and dryers, etc. Division 31: Earthwork • Structural excavation and backfill (with compaction) - assume 2 feet of working space on all sides and excavation slope of I : I. Division 32: Exterior Improvements • Fencing, sidewalks and driveways ...etc.

PROJECT REPORT

The final report must be submitted as a single PDF file organized in the following sections:

  • Cover Sheet: Your information and title of the report. • Proposal Summary Sheets: summary table of cost estimates in both CSI MasterFormat and AST

Uniformat II. (see spreadsheet templates posted on Canvas). • Separate section for each CSI division, consisting of: o Summary sheet including cost items identified for the division. The description of each item should be clear and written to describe the work item not the description of the RS Means item used for pricing (see cover table template on Canvas), o Estimated cost of items and divisions, included in the above summary table, o List of all the assumptions made in order to complete the quantity takeoffs, and o Typed takeoff calculations of all quantities included in the estimate or a scanned copy of neatly written and properly-organized handwritten takeoff calculations. You should: ■ Keep calculations neat and clear. ■ Separate calculations of different items using lines and titles. ■ Mention name of methods that you used in calculations (if applicable). ■ Show proper and adequate comments for your calculations. In addition to the PDF file, the Microsoft Excel file used to develop the cost summary sheets mentioned above should also be submitted. Term Project Assignment 09/11/2019 Page 2| 3 DEPT. OF CONSTRUCTION MANAGEMENT BCN 3611 - CONST. COST ESTIMATING I

FALL 2019

EVALUATION CRITERIA

Submissions will be evaluated using the following rubric Organization and Presentation 15 Division 1 - General Requirements 10 Division 3 - Concrete 10 Division 4 - Masonry 10 Division 5 - Metals 5 Division 6 - Wood 10 Division 7 - Thermal and Moisture Protection 5 Division 8 - Openings 5 Division 9 - Finishes 10 Division 10 - Equipment 5 Division 31 - Earthwork 10 Division 32 - Exterior Improvements 5 Total 100

The grade for the 11 divisions will be based on:

  • The comprehensiveness of the estimate (i.e. including all the applicable items that need to be estimated) • The accuracy of the quantity take-off • The appropriateness of the cost items selected from RS Means

Engineering & Computing

FLORIDA INTERNATIONAL UNIVERSITY

Term Project Assignment 09/11/2019 Page 31 3 DEPT. OF CONSTRUCTION MANAGEMENT BCN 3611 - CONST. COST ESTIMATING I

FALL 2019

TERM PROJECT ASSIGNMENT DESCRIPTION One-Story Single Family House (MAKU Residence)

OBJECTIVE AND GENERAL REQUIREMENTS

The objective of the term project assignment is to prepare a Bid Proposal for constructing a one-story single family house (MAKU Residence). Students must approach the assignment from the perspective of a construction contractor attending a bid, and prepare a professional price proposal using their knowledge, skills and common sense. This requires proper efforts with regards to:

  • Reading and understanding plans; • Recognizing construction work items; • Surveying the quantity for various types of work; • Using cost databases to acquire cost of construction efforts; • Estimating indirect and total cost of construction; and • Submitting and presenting a professional proposal of their cost estimation.

General requirements of the proposal are as following:

  • This is an individual assignment and students will not be allowed to work in groups. • Use the project plans and other reference material posted on Canvas to identify the scope of work

in this project and complete the quantity take-off. • Follow the CSI MasterFormat® (2004 Edition) in organizing the cost estimate proposal. • Use the R.S. Means Online website (https://www.rsmeansonline.com) to get cost data for all identified work items. It is the students’ responsibility to follow up on the invitation email to setup an account on the R.S. Means Online website and to inform the instructor immediately if they have not received such email (double check your email spam folder).

  • In case of any missing or incomplete information, students can make reasonable and justifiable assumptions. All assumptions must be clearly listed in the proper sections of the proposal, as described later in this document.

MINIMUM SCOPE

This section describes the minimum scope of work required in this project. This includes items from the following 11 CSI MasterFormat® divisions: Division 01: General Conditions and Requirements • Identify all general requirement items that should apply to this job, assuming 12 month duration for entire construction. Students are encouraged to make reasonable and justifiable assumptions based on common sense and regular construction practices to cover any missing information. Division 03: Concrete (for Slab, Footings, and Foundations) • Concrete forming and reinforcing steel, including required accessories (use separate cost items) • Concrete placement (including curing and finishing, wherever applicable) Division 04: Masonry • Masonry units and accessories (including mortar and grout, if needed) • Bond Beams Engineering & Computing

FLORIDA INTERNATIONAL UNIVERSITY

Term Project Assignment 09/11/2019 Page 1| 3 Engineering DEPT- OF c o n s t r u c t i o n m a n a g e m e n t & Computing BCN 3611 - c o n s t , c o s t e s t i m a t i n g i

FALL 2019FLORIDA INTERNATIONAL UNIVERSITY

Division 05: Metals • Wall studs Division 06: Wood • Roof framing structure (prefabricated truss system) and sheathing • Others Division 07: Thermal and Moisture Protection • Below-grade moisture protection (primer, vapor barrier, protection board, coving material, etc.) • Walls (interior and exterior) and ceiling thermal insulation. Use R-l 1 insulation for interior walls. • Roof Tiles and accessories Division 08: Openings • Doors and Windows Division 09: Finishes • All wall, flooring and ceiling finishes Division 11: Equipment • Residential appliances such as kitchen equipment, washers and dryers, etc. Division 31: Earthwork • Structural excavation and backfill (with compaction) - assume 2 feet of working space on all sides and excavation slope of I : I. Division 32: Exterior Improvements • Fencing, sidewalks and driveways ...etc.

PROJECT REPORT

The final report must be submitted as a single PDF file organized in the following sections:

  • Cover Sheet: Your information and title of the report. • Proposal Summary Sheets: summary table of cost estimates in both CSI MasterFormat and AST

Uniformat II. (see spreadsheet templates posted on Canvas). • Separate section for each CSI division, consisting of: o Summary sheet including cost items identified for the division. The description of each item should be clear and written to describe the work item not the description of the RS Means item used for pricing (see cover table template on Canvas), o Estimated cost of items and divisions, included in the above summary table, o List of all the assumptions made in order to complete the quantity takeoffs, and o Typed takeoff calculations of all quantities included in the estimate or a scanned copy of neatly written and properly-organized handwritten takeoff calculations. You should: ■ Keep calculations neat and clear. ■ Separate calculations of different items using lines and titles. ■ Mention name of methods that you used in calculations (if applicable). ■ Show proper and adequate comments for your calculations. In addition to the PDF file, the Microsoft Excel file used to develop the cost summary sheets mentioned above should also be submitted. Term Project Assignment 09/11/2019 Page 2| 3 DEPT. OF CONSTRUCTION MANAGEMENT BCN 3611 - CONST. COST ESTIMATING I

FALL 2019

EVALUATION CRITERIA

Submissions will be evaluated using the following rubric Organization and Presentation 15 Division 1 - General Requirements 10 Division 3 - Concrete 10 Division 4 - Masonry 10 Division 5 - Metals 5 Division 6 - Wood 10 Division 7 - Thermal and Moisture Protection 5 Division 8 - Openings 5 Division 9 - Finishes 10 Division 10 - Equipment 5 Division 31 - Earthwork 10 Division 32 - Exterior Improvements 5 Total 100

The grade for the 11 divisions will be based on:

  • The comprehensiveness of the estimate (i.e. including all the applicable items that need to be estimated) • The accuracy of the quantity take-off • The appropriateness of the cost items selected from RS Means

Engineering & Computing

FLORIDA INTERNATIONAL UNIVERSITY

Term Project Assignment 09/11/2019 Page 31 3

  • Fire Prevention Program
  • Modern Computer Architecture - Memory and I/O Systems
  • no plagiarism
  • Assignment 5
  • its due in 2 hrs
  • Why is a perfectly competitive firm a "wage taker"? (1 point) 1. To maximize its profits, how much labor should a perfectly competitive hire? (1 point) 1. What is another name for the firm's labor demand curve? (1 point) 1. What two things d
  • 5-5
  • human brain
  • Juvenile Prostitution
  • Marijuana should be not legalized.
7,965views
4.1
(112 ratings)

Related Study Guides

3 Assignment Remote Work Environments in a Global Corporation. | CSIS 343 - Cybersecurity

2. Secure Remote Access Solutions: Recommend secure remote access solutions for employees working from various locations. Discuss the importance of Virtual Private Networks (VPNs), multi-factor authen...

educationhuman-resources

ENG315 Week 8 | General Engineering in Engineering - University of Maryland

5. Use PowerPoint voice-over and / or the notes section to present your slides. Your assignment must follow these formatting requirements: - Include a title slide containing the title of the assignmen...

communicationhuman-resources

It specific topic | NUR 307 | Southern New Hampshire University - Manchester, NH

5. Rationale: Provide a rationale for using each information and communication technology in the scenario. What to Submit Submit your completed Module One Activity Template. Your submission should be...

communicationinformation-systems

IT3215 | Programming Methods in Computer Science - Capella university

IT3215 Introduction to JavaScript Unit 05 Assignment Query Strings and Storing Persistent Information Overview As Web forms get longer, we very commonly see them split across multiple pages to collect...

economicscomputer-science

Liberty university bibl 104 quiz 1 answers (a+) | History homework help

LIBERTY UNIVERSITY BIBL 104 QUIZ 1 ANSWERS (A+) indigo11IMPORTANT: AFTER PURCHASE, PLEASE SCROLL DOWN BELOW THIS PAGE AND DOWNLOAD FILES WITH ANSWERS. LIBERTY UNIVERSITY BIBL 104 QUIZ 1 Set 2019: 1. T...

historyinformation-systems

Project | Management homework help

5. Submission package: Tuesday morning Eastern. This cadence emphasizes early value and interim deliverables, consistent with PMBOK 7e’s Delivery of Value perspective. Change control within documents...

political-sciencecommunication

Q-3 | Computer Science homework help

q-3 UnknownpHacking web servers involves gaining unauthorized access to the server that hosts a website or web application. This can be done through various techniques and vulnerabilities, and once ac...

computer-scienceinformation-systems

4 questions | Applied Sciences homework help

15. They claim that sugar is a deadly poison. 16. They claim that everyone needs to be detoxified. 17. They recommend a wide variety of substances similar to those found in your body. 18. They claim t...

educationstatistics

Need Help With A Similar Question?

Our experts deliver perfect solutions with guaranteed A+ grades

A+
Student Grade
98%
Success Rate
12h
Delivery Time
Join 1,000+ students who got their perfect solutions
Rated 4.9/5 by satisfied students

Need Help With This Question?

Academic Expert

Subject Matter Specialist

98%
Success Rate
24/7
Support

Why Students Trust Us

  • PhD-Level Expertise
  • Original Work Guarantee
  • Better Grade or Free

"Got an A+ on my assignment. Exactly what I needed!"

Recent Student