VA DEQ ESC Inspector Exam Questions and Answers 100% Pass - SWM - Stuvia US

VA DEQ ESC Inspector Exam Questions and Answers 100% Pass VESCP - ✔✔Virginia Erosion and Sediment Control Program

  • Administered by counties/cities (must), towns (may)
  • MUST BE APPROVED

Minimum Standard 1 - ✔✔Stabilization permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to be left dormant for more than one year Site NOT at Final Grade - ✔✔- stabilize in 14 days

  • temporarily seed
  • mulch
  • permanently stabilize if dormant > 1 year

Site at Final Grade - ✔✔- stabilize in 7 days (recommended immediately)

  • permanently or temporarily seed and mulch
  • mulch/matting/straw

Created by Katelyn Whitman © 2025, All Rights Reserved. 100% PASS GUARANTEE ,2|Page Minimum Standard 2 - ✔✔Stock Piles, Waste and Borrow Areas during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and detains from disturbed areas Minimum Standard 3 - ✔✔Permanent Vegetation permanent vegetation cover shall be established on denuded areas not otherwise permanently stabilized (permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with this*) reduce erosion and decrease sediment yield from disturbed area this is the standard used to verify that a site is ready for release of bonds or surety Minimum Standard 4 - ✔✔First-Step Measures Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place Created by Katelyn Whitman © 2025, All Rights Reserved. 100% PASS GUARANTEE ,3|Page a certain amount of initial land disturbance may be required to provide access for equipment to install the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter controls are in place intercepts and detains small amounts of sediment from disturbed areas during construction operation to prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate level channel flow Perimeter Controls - ✔✔assures that sediment does not leave the perimeter of the land-disturbing area once site clearing, grading, and construction commences Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions, diversions Minimum Standard 5 - ✔✔Earthen Structure Stabilization stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions immediately after installation reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream or off- site areas Minimum Standard 6 - ✔✔Traps and Basins Created by Katelyn Whitman © 2025, All Rights Reserved. 100% PASS GUARANTEE , 4|Page sediment traps and basins shall be designed and constructed based upon the total drainage area (not just disturbed area) to be served by the trap or basin Sediment Traps - ✔✔minimum storage capacity shall be 134 cubic yards per acre of drainage area and shall only control drainage areas less than 3 acres *stone outlet = trap* Sediment Basins - ✔✔surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration; runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. Sediment Trapping Devises - ✔✔1. place near the lowest drainage points of a project

4,270views
4.8
(186 ratings)

Related Study Guides

For this assessment, you will develop an online resource repository | Applied Sciences homework help

For this assessment, you will develop an online resource repository of at least 12 annotated professional or scholarly resources that you consider critical for the audience of your safety improvement...

nursingcommunication

Health promotion plan presentation | Nursing homework help

Health Promotion Plan Presentation Mrruche Build a slide presentation (PowerPoint preferred) of the health promotion plan you developed in the first assessment. Then, implement your health promotion p...

educationnursing

IT3215 | Programming Methods in Computer Science - Capella university

IT3215 Introduction to JavaScript Unit 01 Discussion DQ1 Getting Started With JavaScript JavaScript has been one of the most popular scripting languages for dynamic interactivity. It is a completely d...

communicationart-design

IT3215 | Programming Methods in Computer Science - Capella university

4. Jen Stevens Hint: Use the splice function in order to remove a specific item from the array. Tip: The array index starts at 0, so when displaying the index, you will need to add 1 to the index valu...

communicationart-design

Need discussion in 15 hours or less | Education homework help

NEED DISCUSSION IN 15 HOURS or LESS NeNe1994PLEASE UPLOAD ALL 4 DISCUSSION RESPONSE SEPARATELY!!!!! - a year ago - 20 Week5Discussion1Response.pdf Week5Discussion2Response.pdf Week5Discussion1Response...

communicationeducation

Proposal paper | Computer Science homework help

3. A ue rb ac h P ub lis he rs , I nc or po ra te d. A ll rig ht s re se rv ed . Disaster Recovery and Business Continuity Planning ◾ 147 in place. Lacking this regulation, organizations need to look...

educationcommunication

Walden HLTH6412 Module 4 Discussion 1 Latest 2025

HLTH6412-1/HLTH8412E-1/HLTH5412 Health Ed & Comm. Strategies Module 4 Discussion 1 RELAYING INFORMATION IN A CRISIS SITUATION It was a calm evening in a small town on the night of September 29, 2023....

communicationeducation

Work 1 | Education homework help

3. In this benchmark assignment, you will be planning a Wellness Fair for the students and families of your kindergarten class. The Wellness Fair will incorporate the mini-lesson plans you previously...

educationart-design

Need Help With A Similar Question?

Our experts deliver perfect solutions with guaranteed A+ grades

A+
Student Grade
98%
Success Rate
12h
Delivery Time
Join 1,000+ students who got their perfect solutions
Rated 4.9/5 by satisfied students

Need Help With This Question?

Academic Expert

Subject Matter Specialist

98%
Success Rate
24/7
Support

Why Students Trust Us

  • PhD-Level Expertise
  • Original Work Guarantee
  • Better Grade or Free

"Got an A+ on my assignment. Exactly what I needed!"

Recent Student